Skip to content
DandenongConcreters

Driveways / Crossovers / Paths / Slabs / Patios

Concrete removal and replacement in Dandenong

Old driveways, paths, slabs and paving broken out, loaded and disposed of, and the new surface poured on a corrected base. Removal adds $35 per m2 to the rate for whatever replaces it.

Site measure Free, at your place
Quote Fixed, in writing
Steel In every slab
Area Greater Dandenong only

$130 to $220 per m², supplied and laid. Prices may vary with site conditions and variations.

Most of our calls start with concrete that has failed: a driveway cracked along the tyre tracks, a path lifted over roots, a patio dropped away from the house. Patching moves the problem sideways. Replacement fixes the reason it failed, because the fault is almost never in the concrete; it is in what is underneath.

The job, start to finish

  1. Saw cut at the boundary and at any joins with surfaces staying.
  2. Break out and load the old concrete, pavers or asphalt. Disposal is included in the rate.
  3. Fix the cause. On Greater Dandenong’s clay that is usually a poor base or water getting under the slab, so the base is rebuilt and compacted and the drainage corrected before anything is poured.
  4. New steel, new pour, in plain, coloured or exposed aggregate, to the build-up on the specification page.

One number, not two trades

Removal priced separately from the new pour is how replacement jobs blow out: the demolition contractor leaves, the concreter finds the base is worse than quoted, and the variation lands on you. Here it is one crew and one written quote covering the cut, the break-out, the disposal, the base correction and the new surface.

What it costs

Removal and disposal adds $35 per square metre to whatever replaces it, so a replacement driveway runs $130 to $220 per m2 all in by finish, a replacement path $125 to $165, and a replacement patio $135 to $215. The cost guide sets out worked examples, and the calculator includes a removal option so the range you see is the whole job.

Concrete crew placing and levelling a replacement pour
New concrete going in after removal
Steel reinforcement mesh tied before the pour
Steel tied and checked before the pour

Where we pour concrete removal and replacement

Dandenong, Dandenong North, Dandenong South, Keysborough, Noble Park, Springvale and nowhere else: one council, known inside out.

Your job, start to finish

What happens when you call

  1. 01

    Site measure

    Free, at your place. The job is measured, falls and access are checked, and finishes are picked from sample boards against the house in daylight.

  2. 02

    One written quote

    One fixed number in writing, itemised against the published specification. If a council crossover permit may be required, you know before anything is booked.

  3. 03

    The build

    The old surface out where there is one, base material brought in and compacted where the ground needs it, steel mesh laid, then the pour. Most residential jobs are one to two days on site.

  4. 04

    The finish

    Control joints cut to direct any movement, exposed aggregate washed and sealed after cure, and vehicles on it seven days after the pour.

Common questions

Concrete removal and replacement questions

What does removal and replacement cost?

Removal and disposal adds $35 per square metre to the rate for the new surface. A replacement plain driveway therefore starts around $130 per m2 all in, and exposed aggregate replacement runs up to about $220. Prices may vary with site conditions and variations; the written quote after a site measure is fixed.

Can you resurface my old concrete instead?

If the base is sound and the cracks are only in the surface, sometimes. But most concrete that looks bad is moving underneath, and an overlay cracks in the same places within a year or two. We tell you honestly at the site measure which one you are looking at.

What happens with tree roots?

Roots are cut back at the slab edge and the new concrete goes over a thicker base with extra mesh. Where a significant street tree is involved, the council may need to be consulted before roots are touched.

Where does the old concrete go?

Loaded out and taken to a recycler, where it is crushed for reuse as road base. Disposal is included in the removal rate, and the site is left clear, not stockpiled.

One fixed written quote after a free site measure.

Call (03) 4059 3737 Get a quote